The PeS 2020 e-Beam System®, a semiconductor photocathode e-beam generating system, has successfully reached over 1000 hrs at 15 µA current emission, with a stability of 0.03% while demonstrating 96% uptime.

For more details, please contact us.

It has long been believed that the semiconductor photocathode e-beam technology is suitable for academic purposes only and inappropriate for industry usage. This is because no one has ever proved its long term performance. However, the results here show it can be used in production environments with confidence.

We will keep testing continuously and further prove the superiority of this technology.